PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilling and compating between column lines D-E Facing South (800x600).jpg Building rebar mats for Stair -4 (3rd Floor) Facing North-East (800x600).jpg Elev. 1,2,3 door frames (3rd Floor) Facing North-East (800x600).jpg Installing and tying rebar mats at Elev. 5,6 (4th Floor) Facing West (800x600).jpg Installing bearing plate boxes at Elev. 1,2,3 (3rd Floor) Facing East (800x600).jpg Installing metal decking at Derrick -3 (3rd Floor) Facing North (800x600).jpg Installing safety cables and poles at Derrick -3 (2nd Floor) Facing North (800x600).jpg
Previous pageNext page Elev. 1,2,3 door frames (3rd Floor) Facing North-East (800x600)
Elev. 1,2,3 door frames (3rd Floor) Facing North-East (800x600)